Filter Replacement Santa Fe Water Treatment Plant 24/40/B

Agency: Santa Fe
Level of Government: State & Local
Category:
  • 68 - Chemicals and Chemical Products
  • Y - Construction of Structures and Facilities
Opps ID: NBD12477817822310845
Posted Date: Dec 21, 2023
Due Date: Jan 10, 2024
Source: https://santafenm.gov/solicita...
Bid Number: 24/40/B
Status: Open
Open Date: 12/20/2023
Close Date: 01/10/2024 2:00pm

Project Manager
Jonathan Montoya

jmmontoya@santafenm.gov


505-955-4373

Proposal Submission Information


IMPORTANT BIDDING INFORMATION:
Submission of Bid: Due Date –January 10, 2024, at 2:00 P.M. (MST/MDT) at which time the sealed Bids will be recorded as received and opened.

Solicitation packets are available at the following website: https://www.santafenm.gov/bids_rfps

BID SUBMISSION:
Complete bid documents, as required, by this ITB. ALL Specifications, submittal required documentation, supporting materials, certificates, etc. in addition to the bid documents must be attached to form a complete responsive bid. (NMSA 1978, §§ 13-1-82 through 13-1-84 and 13-1-133)

Electronic bid submissions through the following City of Santa Fe ShareFile upload:
https://cityofsantafenm.sharefile.com/r-r2e1c990e0b104cada29f9959d0ebfbcc

Description

The City of Santa Fe, Water Division is seeking bids for the c omplete replacement of four (4) 400Sq/Ft dual media gravity filters located at the Canyon Road Water treatment Plant, 1780 Canyon Road, Santa Fe NM, 87501.  The replacement will consist of complete removal and installation of the current filter media and underdrains. *Please notemedia has already been removed from one filter to assess the condition of the current under drains* Some modification of the current air scour piping may be required. Installation will be completed in a sequential manner to allow the Canyon Road Water treatment plant to remain partially in service during the installation.

The Contractor will coordinate with the Water Division to complete the described work in a time frame that will not conflict with the Nichols Dam rehab project which is estimated to begin in the spring of calendar year 2024. The Water Division estimates the project to take approximately 4 months to complete depending on availability of products.

ITB Final 12-20-23.pdf 398KB

ITB Final 12-20-23.docx 97KB

Items 12-08-23-ks.xlsx 18KB