New Mexico Bids > Bid Detail

Cibola National Forest Concrete Pad at USFS Clayton, NM Administrative Site

Agency: AGRICULTURE, DEPARTMENT OF
Level of Government: Federal
Category:
  • 54 - Prefabricated Structures and Scaffolding
Opps ID: NBD00159706026252043
Posted Date: Sep 14, 2023
Due Date: Sep 20, 2023
Solicitation No: 127EAX23Q0094
Source: https://sam.gov/opp/e2eed52f85...
Follow
Cibola National Forest Concrete Pad at USFS Clayton, NM Administrative Site
Active
Contract Opportunity
Notice ID
127EAX23Q0094
Related Notice
Department/Ind. Agency
AGRICULTURE, DEPARTMENT OF
Sub-tier
FOREST SERVICE
Office
USDA-FS, CSA SOUTHWEST 7
Looking for contract opportunity help?

Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.

General Information View Changes
  • Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
  • All Dates/Times are: (UTC-06:00) MOUNTAIN STANDARD TIME, DENVER, USA
  • Updated Published Date: Sep 14, 2023 02:41 pm MDT
  • Original Published Date: Sep 08, 2023 03:22 pm MDT
  • Updated Date Offers Due: Sep 20, 2023 05:00 pm MDT
  • Original Date Offers Due: Sep 20, 2023 05:00 pm MDT
  • Inactive Policy: 15 days after date offers due
  • Updated Inactive Date: Oct 05, 2023
  • Original Inactive Date: Oct 05, 2023
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: 5440 - SCAFFOLDING EQUIPMENT AND CONCRETE FORMS
  • NAICS Code:
    • 238110 - Poured Concrete Foundation and Structure Contractors
  • Place of Performance:
    Clayton , NM 88415
    USA
Description View Changes

A site visit shall be conducted on 09/18/2023 at 1300 MDT (1:00PM). Contractors may either arrive at the administrative office, or proceed to the site.

The address and coordinates are respectively as follows:



714 Main St Clayton, NM 88415

36°28'9.46"N 103° 7'35.85"W

The Contractor will prepare the site including grading and dirt work, install a 30' X 30' X 6" deep, 3000 psi concrete slab

with fiberglass mixed into concrete, and a 6” wide X 2’ deep continuous footing with rebar. The exact location will be

discussed with USFS personnel; see site map. Contractor will install concrete forms (2X6 lumber/steel forms) and make

sure the pad will be square. Contractor will supply all materials to install the forms and any other tools needed to pour

concrete. Rebar will not be utilized in the floor since fiberglass will be mixed with the Concrete. Concrete will be hauled

locally at 3 miles one way (5 min drive). Bull float will be used to get a rough finish on concrete. No vibration equipment

will be used. A 10 day advance notice prior to starting concrete work to allow for time to prep for the concrete pad.


Attachments/Links
Contact Information
Contracting Office Address
  • 333 Broadway BLVD SE
  • Albuquerque , NM 871023498
  • USA
Primary Point of Contact
Secondary Point of Contact


History

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >