NM FS 220(1), Romero Creek Bridge

Agency: TRANSPORTATION, DEPARTMENT OF
Level of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Opps ID: NBD00159436795124067
Posted Date: Jun 1, 2023
Due Date: Jun 16, 2023
Solicitation No: 6982AF23SS0027
Source: https://sam.gov/opp/4569e84597...
Follow
NM FS 220(1), Romero Creek Bridge
Active
Contract Opportunity
Notice ID
6982AF23SS0027
Related Notice
Department/Ind. Agency
TRANSPORTATION, DEPARTMENT OF
Sub-tier
FEDERAL HIGHWAY ADMINISTRATION
Office
6982AF CENTRAL FEDERAL LANDS DIVISI
Looking for contract opportunity help?

Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.

General Information
  • Contract Opportunity Type: Sources Sought (Original)
  • All Dates/Times are: (UTC-06:00) MOUNTAIN STANDARD TIME, DENVER, USA
  • Original Published Date: Jun 01, 2023 10:19 am MDT
  • Original Response Date: Jun 16, 2023 02:00 pm MDT
  • Inactive Policy: 15 days after response date
  • Original Inactive Date: Jul 01, 2023
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
  • NAICS Code:
    • 237310 - Highway, Street, and Bridge Construction
  • Place of Performance:
    Luna , NM 87824
    USA
Description

THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.



THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs. Interested businesses must submit the following by email to CFLAcquisitions@dot.gov (Attn: Laura Vallejos) for receipt by close of business (2 p.m. local Denver time) on May 30, 2023:



(1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor;



(2) A list of all confirmed socioeconomic categories (i.e., 8(a), small disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business;



(3) A letter from a bonding agent stating your firm’s capability to bond for a single project of $2 million, and your firm’s aggregate bonding capacity; and



(4) Provide a list of road construction projects of equal or greater value and scope to the NM FS 220(1), Romero Creek Bridge project in which you performed the construction of removal of structures and obstructions, embankment construction, placement of roadway aggregate, placement of asphalt concrete pavement, construction of prefabricated steel bridge, structural concrete, and installation of guardrail and terminal sections.



DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.



The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/



Project Details: NM FS 220(1), Romero Creek Bridge



This project is located in the Gila National Forest in western-central New Mexico. The terrain is rolling and mountainous with elevations ranging up to 8300 ft.



The Romero Creek Bridge deck has large areas (approximately 60%) of delamination that are deep (2” to 10”). The most recent bridge inspection results indicate the structural evaluation of the bridge to be in poor to serious condition. Proposal would replace this bridge with a similar structure, add bridge rail/guardrail and pave the approaches 100' on each side of the bridge to keep rocks/debris/soil off the deck and to prevent sediment from entering the stream. NFSR 220 will be a main haul route for an upcoming restoration project within the next few years. There is potential for thousands of loads of timber to come out on NFSR 220.



SCOPE OF THE WORK:



This project consists of replacing an existing bridge structure on Forest Route 220 (MP 7.325) over Romero Creek in Catron County, New Mexico. The existing single-span bridge’s overall length is 30.4-ft and width (out-out) measures 16.0-ft. The existing roadway width is 14.0-ft.



SIGNIFICANT QUANTITIES:



Significant items include (quantities are subject to change):




  • 1 (LPSM) of Removal of Existing Structures and Obstructions

  • 250 CUYD of Embankment Construction

  • 250 TON of Roadway Aggregate

  • 100 TON of Asphalt Pavement

  • 14-ft x 48-ft of Prefabricated Steel Bridge

  • 50 CUYD of Structural Concrete

  • 200 LNFT of Guardrail, including terminals

  • 100 hours of Equipment Hours

  • 120 hours of Labor Hours



It is anticipated this project will be advertised in October 2023, awarded in December 2023, and under construction April 2024 thru October 2024.



The estimated price range of the project work is between $700,000 and $2,000,000.



ADDITIONAL INFORMATION FOR NOTICE:




  • Adjacent segments of Forest Route 220 will remain closed during construction and can be used for contractor staging and storage.

  • Access is to both sides of the bridge is possible by detour.

  • Shallow foundations are anticipated






Attachments/Links
Contact Information
Contracting Office Address
  • 12300 W. DAKOTA AVE
  • LAKEWOOD , CO 80228
  • USA
Primary Point of Contact
Secondary Point of Contact
History
  • Jun 01, 2023 10:19 am MDTSources Sought (Original)